Frequently asked questions

What is the first step if I'm thinking about building?

The first step is to contact our team to arrange an initial consultation. During this meeting, we discuss your ideas, budget, timeline, and site details. From there, we can guide you through the design and planning process to begin your project.

I’m still in the early stages of buying a block. Can you provide advice?

Yes, and this is often the best time to speak with a builder.

Before purchasing land, we can help you consider factors such as site access, slope, orientation, zoning, and potential construction costs. These elements can have a significant impact on the type of home you can build and the overall budget.

Getting professional input early can help you choose a block that suits your plans and avoids costly surprises later.

Do I engage a Builder or Architect first?

The ideal situation is that both the architect and builder are involved from the concept stage of the project. This helps ensure the vision and budget are aligned from the beginning, and the design remains achievable.

However, if you already have architectural plans or a builder in mind, that is perfectly fine. The most important factor is clear communication between the builder, architect, and client throughout the process.

Can you help with the design process?

Absolutely. We can work with you from concept through to completion. This ensures your ideas are translated into a well-planned home that balances aesthetics, functionality, and budget.

What should I have prepared before our meeting?

You don’t need to have everything finalised before speaking with us. However, it helps to have a general idea of your budget, preferred home style, number of rooms, and any features that are important to you.

If you have sketches, inspiration images, or a floor plan, bringing these along can help the conversation move forward more efficiently.

Can SLD Projects manage council approvals and permits?

Yes. We can assist with the approval process and coordinate with architects, engineers, and certifiers to ensure your project meets all council and regulatory requirements before construction begins.

How long does the entire process take?

The full process, from initial design through to construction completion, typically takes between 12 and 24 months depending on the complexity of the project.

The timeline generally includes:

●      Design and planning

 

●      Council approvals and documentation

 

●      Pre-construction preparation

 

●      Construction and finishing

 

We provide a clear timeline early in the process so you know what to expect at each stage.

Do you provide a square metre rate?

For custom homes, a square metre rate can often be misleading.

The reality is that for a custom-built project there is no fixed rate. Every project is different, with unique designs, site conditions, and client requirements.

A square metre rate can sometimes help establish a starting budget. However, accurate pricing requires a detailed estimate where plans, scope of works, site conditions, and any constraints are properly assessed.

How many projects do you take on each year?

To maintain quality and provide close attention to each project, we take on a limited number of builds at any one time.

If you are considering building in the near future, it is helpful to start the conversation early so we can discuss timing and availability.

How much involvement will I have in the build?

Our relationship with you is a priority. We believe in collaboration and teamwork with our clients from the very beginning to achieve the best possible outcome.

We hold fortnightly site meetings and keep you updated through our online client portal. We encourage you to ask questions and be involved as much as you would like throughout the process.

Can you work with plans I already have?

Yes. If you already have architectural plans or concept drawings, we can review them and provide feedback from a construction perspective.

In many cases, early builder involvement can help identify opportunities to improve buildability, clarify scope, and align the design with your budget before construction begins.

Should I renovate or knock down and rebuild?

This depends on the condition of your existing home, your long-term goals, budget, and the potential of the site.

In some cases, a renovation can improve functionality and add value while retaining parts of the existing home. In other situations, a knockdown rebuild may provide a better outcome by allowing a completely new layout, improved energy efficiency, and fewer structural limitations.

We can help assess your property and provide honest advice on which option is likely to deliver the best long-term result for your family and investment.

How much does a knockdown rebuild cost in Sydney?

There’s no single figure, because no two sites or homes are the same. The cost depends on the house that’s coming down, the block, the size and design of the new home, and the finishes you choose. A knockdown rebuild also carries costs a vacant block doesn’t, such as demolition, asbestos removal, disconnecting services and approvals.

The most reliable way to get a number is a detailed cost estimate based on your concept design. At SLD Projects, this is a document of up to 40 pages that works through each part of the build, so you know where your budget sits before you commit to the next stage.

What drives the price of a knockdown rebuild?

The biggest factors are usually:

  • The size and complexity of the design. Floor area, number of levels, spans, glazing and basements all have a large effect.
  • Your site. Slope, soil conditions, access and the position of neighbouring buildings can change how the home is built and what’s needed below ground.
  • Demolition and site preparation. The size and construction of the existing house, and whether asbestos is present, affect the cost of removing it.
  • Approvals and consultants. Heritage, bushfire, stormwater, structural and geotechnical requirements vary from site to site.
  • Selections and finishes. Kitchens, joinery, windows, tiles and fittings can move the budget significantly.
  • Decisions made late. Changes after the contract is signed are a common cause of cost increases, which is why we resolve selections and scope before construction starts.

You’ll also want to budget for costs outside the build itself, such as temporary accommodation while the home is under construction.

Do I need council approval for a knockdown rebuild in Sydney?

Yes, you’ll need approval for both the demolition and the new home. In NSW there are two main pathways.

A complying development certificate (CDC) is a fast-track approval for projects that meet set planning standards. It can be issued by your council or an accredited certifier.

A development application (DA) is lodged with council and assessed on its merits. It’s needed when a project doesn’t meet the CDC standards, or where a CDC isn’t available, such as for new homes in heritage conservation areas. Many streets across the Inner West fall into this category.

Which pathway applies depends on your site and your design. We work this out early, so the design is developed with the right approval in mind.

How long do approvals take, and how long does a knockdown rebuild take overall?

A CDC can be issued in as little as 20 days once a complete application is lodged. DA timeframes vary between councils and depend on the project, the site and whether neighbours or heritage matters are involved.

On our projects, design for approval takes around 3 months, then council assessment follows. We recommend allowing at least 6 months for this stage overall. Before that, survey, concept design and the cost estimate take around 1 to 2 months. After approval, construction drawings and selections take around 3 months, and preparing to start on site takes another 4 to 6 weeks.

Construction time then depends on the size and complexity of the home. Every project is different, and we’ll give you a realistic timeline for yours during the cost estimate stage. For more detail on each stage, read the knockdown rebuild process in Sydney, step by step.

Can you build on narrow or difficult blocks?

Yes. Custom homes are often designed specifically to suit challenging sites, including narrow blocks, steep sites, or irregularly shaped land.

Thoughtful design and planning can turn site constraints into opportunities for unique layouts, natural light, privacy, and improved functionality.

How do you keep projects on budget?

Careful planning and clear communication are essential.

We invest significant time during the pre-construction phase to ensure selections, documentation, and scope are well defined before construction begins. This helps reduce variations and provides greater confidence throughout the project

How often will I receive updates during the build?

Communication is a key part of our process.

We provide regular updates throughout construction, including scheduled site meetings and access to our online client portal, so you always understand the progress of your project.

Can you help with interior selections and finishes?

Yes. We can guide you through the selection process for finishes, fixtures, and materials to ensure your home feels cohesive and suits your lifestyle.

We can also work alongside your interior designer if you already have one involved in the project.

How do I compare builders properly?

When comparing builders, it is important to look beyond price alone.

Experience, communication, transparency, quality of workmanship, and the level of detail in the documentation all play a major role in the success of a project.

We encourage clients to compare what is actually included in each quote so they can make an informed decision.

What areas does SLD Projects service?

SLD Projects services clients across Sydney . If you are unsure whether your project falls within our service area, feel free to contact our team and we will be happy to discuss your project location.

What makes SLD Projects different from other builders?

We focus on quality craftsmanship, communication, and strong client relationships throughout the entire process.

By taking on a limited number of projects each year, we are able to provide greater attention to detail, consistent communication, and a more personalised building experience.

How do I choose a custom home builder in Sydney?

Start with the questions that show you how a builder actually works, not just what they say they build. Ask who will manage your project day to day, and whether that’s the same person who quoted the job. Ask how pricing is set, and whether selections and finishes are worked out before you sign or figured out as you go. Ask to see completed projects similar in scale to yours, and if you can, talk to a past client directly rather than relying on testimonials alone.

It’s also worth asking how many projects a builder takes on at once. A builder juggling a large number of sites will have less time for any one of them. A smaller, more selective build list usually means more hands-on attention, which matters more on a project like this than a lower price.

What questions should I ask before signing a contract?

At minimum, what’s included in the fixed price versus what could become a variation, what the payment schedule looks like, how long the build is expected to take, and who you’ll actually be dealing with once construction starts. If a builder can’t answer these clearly before you sign, that’s worth paying attention to.

What does a full design and build service actually include?

It means one team is responsible for your custom home project from concept through to handover, rather than you coordinating a separate architect, builder and consultants yourself. It typically covers working out what your block will support, designing around your brief, your site and council requirements, resolving selections and finishes before pricing is finalised, a fixed price contract once the scope is locked in, and the same team managing the build through to completion and beyond, with defects and warranty support afterwards.

How is this different from hiring an architect and builder separately?

When design and construction sit with different parties, there’s more room for the design to move ahead of what the build can actually deliver on budget, and more back and forth if something needs to change. With one team across both, cost and buildability are considered alongside the design from the start, which is a big part of why the price you agree to is more likely to hold.

Our Process

Our processes are what drives our success and allows for a client journey and project outcome that is unparalleled.

Building an architectural home can be complex. But there is no need to over complicate the process. We are here to guide you through, minimise any obstacles and eliminate any fears.

Let Simon talk you through our process.

Ready to talk about a project?

If you’re considering building a custom home, knockdown rebuild or major renovation in Sydney, we’d love to hear about your plans. Get in touch and we’ll walk you through what building with SLD Projects actually looks like, from the first conversation through to completion.