Knockdown Rebuild Sydney
Keep the street you love. Build the home that fits it.
A new home designed for your block and the way you live, with design, approvals and construction handled by one team.
Licensed builder 252316C · 20+ years experience · 2023 HIA NSW Custom Built Home Awards
The right location, the wrong house
Many of the people we meet aren’t looking to move. They like the street, the schools and the neighbours. It’s the house that no longer works, whether it’s the layout, the light, the condition or simply the space.
A knockdown rebuild lets you stay where you are and start again on the block you already own. It’s a big decision, and having the right team beside you from the first site visit makes a real difference.
When a Knockdown Rebuild Makes Sense
Renovating isn’t always the answer. When a home needs structural work, new services and a different layout all at once, you can spend a lot and still be working around the original house.
A knockdown rebuild is often worth a closer look when:
- The house is tired, poorly oriented or in need of major structural work
- The layout doesn’t suit your family, and extending would only add to the problem
- You want a home that makes the most of the block, its outlook and its light
- You’d rather invest in something new than keep working around an old house
Not every block suits a rebuild, and not every house should come down. We’ll talk you through the options before you commit to anything. If a large scale renovation is the better fit, we’ll tell you.
One Team, From Your Existing House to Your New Home
A knockdown rebuild has more moving parts than a build on a vacant block. There’s an existing house to assess and remove, services to disconnect, approvals to secure and a family to move out and back in again.
Our design and build approach brings these together under one team, so each stage is worked through before the next one begins. We look at your site, your ideas and your budget first, then shape the design, resolve the selections and scope, and prepare a detailed cost estimate before construction starts. You know what you’re building, how it will work and what it’s likely to cost.
Simon stays directly involved from the first site visit to handover, so you’re not passed between departments as the project moves from design to demolition to construction.
Our Knockdown Rebuild Process
Discover
We visit your site and talk through your ideas, how you live and your budget, and look at what your block will allow.
Develop
We shape the design around your site and brief, and work out the approval pathway and consultants your project will need.
Prepare
Plans, approvals, selections, scope and costs are brought together, so you know exactly what you’re building before the existing house comes down.
Build
Services are disconnected, the house is demolished and the site is cleared. Our team then manages construction, communication and the details through to handover.
Want more detail on each stage? Read the knockdown rebuild process in Sydney, step by step.
Why Choose SLD Projects
- One team accountable from the existing house to final handover
- A detailed cost estimate before you commit, with selections and scope resolved early to keep variations to a minimum
- Simon directly involved on every project, not just at the start
- A limited number of builds each year, so oversight stays hands-on
- Regular updates through the build, with a single point of contact throughout
- Track progress through our online client portal
- Warranty and aftercare support after handover

About SLD Projects
SLD Projects is a licensed Sydney architectural builder (licence 252316C), specialising in custom homes, knockdown rebuilds and large scale renovations.
Founded by Simon La Delfa, SLD Projects brings together more than 20 years of experience in carpentry, building and site management. Simon is directly involved in every project, from the first site visit to handover.
We work across Sydney, with a strong presence in areas including Canada Bay, Strathfield, Burwood and the Inner West, and take on a limited number of projects each year so we can stay close to the detail. SLD Projects was recognised through the 2023 HIA NSW Custom Built Home Awards.
Recent Projects
Austinmer Project
Architectural Custom Home
A coastal home designed around the view and the ocean breeze, with a basement garage and internal lift giving easy access to every floor.
Bulli Project
Architectural Duplex · Build Only
A coastal home for weekends, summer holidays and everything in between.
Maple Project
Architectural Custom Home · Design and Build
A contemporary new build designed around a central swimming pool, with large windows opening the main living areas onto the outdoor space.
Russell Lea Project
Heritage Major Renovation and Extension
A renovation that brings together the character of a classic Sydney home with more functional, contemporary spaces for family life.
What Clients Say

“Simon at SLD Projects undertook the build of our home, completed it on time, and the communication every step along the way was exceptional. The results exceeded our expectations.”
– Shaun Scott

“Simon and the team kept us up to date with each stage and delivered our finished home on time. I have already recommended SLD Projects to family and friends.”
– Ben Olive

“Simon’s personalised approach, expertise and guidance throughout the whole process made us feel comfortable and confident. We are so happy with the home he has helped create for us.”
– Melissa Mammoliti
Read more on our testimonials page.
Frequently Asked Questions
How much does a knockdown rebuild cost in Sydney?
There’s no single figure, because no two sites or homes are the same. The cost depends on the house that’s coming down, the block, the size and design of the new home, and the finishes you choose. A knockdown rebuild also carries costs a vacant block doesn’t, such as demolition, asbestos removal, disconnecting services and approvals.
The most reliable way to get a number is a detailed cost estimate based on your concept design. At SLD Projects, this is a document of up to 40 pages that works through each part of the build, so you know where your budget sits before you commit to the next stage.
What drives the price of a knockdown rebuild?
The biggest factors are usually:
- The size and complexity of the design. Floor area, number of levels, spans, glazing and basements all have a large effect.
- Your site. Slope, soil conditions, access and the position of neighbouring buildings can change how the home is built and what’s needed below ground.
- Demolition and site preparation. The size and construction of the existing house, and whether asbestos is present, affect the cost of removing it.
- Approvals and consultants. Heritage, bushfire, stormwater, structural and geotechnical requirements vary from site to site.
- Selections and finishes. Kitchens, joinery, windows, tiles and fittings can move the budget significantly.
- Decisions made late. Changes after the contract is signed are a common cause of cost increases, which is why we resolve selections and scope before construction starts.
You’ll also want to budget for costs outside the build itself, such as temporary accommodation while the home is under construction.
Do I need council approval for a knockdown rebuild in Sydney?
Yes, you’ll need approval for both the demolition and the new home. In NSW there are two main pathways.
A complying development certificate (CDC) is a fast-track approval for projects that meet set planning standards. It can be issued by your council or an accredited certifier.
A development application (DA) is lodged with council and assessed on its merits. It’s needed when a project doesn’t meet the CDC standards, or where a CDC isn’t available, such as for new homes in heritage conservation areas. Many streets across the Inner West fall into this category.
Which pathway applies depends on your site and your design. We work this out early, so the design is developed with the right approval in mind.
How long do approvals take, and how long does a knockdown rebuild take overall?
A CDC can be issued in as little as 20 days once a complete application is lodged. DA timeframes vary between councils and depend on the project, the site and whether neighbours or heritage matters are involved.
On our projects, design for approval takes around 3 months, then council assessment follows. We recommend allowing at least 6 months for this stage overall. Before that, survey, concept design and the cost estimate take around 1 to 2 months. After approval, construction drawings and selections take around 3 months, and preparing to start on site takes another 4 to 6 weeks.
Construction time then depends on the size and complexity of the home. Every project is different, and we’ll give you a realistic timeline for yours during the cost estimate stage. For more detail on each stage, read the knockdown rebuild process in Sydney, step by step.
Ready to talk about your block?
If you’re weighing up a knockdown rebuild in Sydney, we’d love to hear about your plans. Get in touch and we’ll talk through your site, your options and what building with SLD Projects looks like, from the first conversation through to completion.
Quick Links
Call Us
Email Us
Address
Level 1/5 George St,
North Strathfield NSW 2137
Builder Licence
NSW 252316C

Follow Us




